ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA)

Meuthia, Yumi ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA). ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA).

[img] Text
6_%5BYMA%5D_6p_Jurnal_Yumi_hal_89_-_94.docx
Available under License Creative Commons Public Domain Dedication.

Download (124kB)
Item Type: Article
Subjects: T Technology > T Technology (General)
Depositing User: Operator Repo Unand
Date Deposited: 19 Apr 2016 02:07
Last Modified: 19 Apr 2016 02:07
URI: http://repo.unand.ac.id/id/eprint/3028

Actions (login required)

View Item View Item