Meuthia, Yumi ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA). ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA).
Text
6_%5BYMA%5D_6p_Jurnal_Yumi_hal_89_-_94.docx Available under License Creative Commons Public Domain Dedication. Download (124kB) |
Item Type: | Article |
---|---|
Subjects: | T Technology > T Technology (General) |
Depositing User: | Operator Repo Unand |
Date Deposited: | 19 Apr 2016 02:07 |
Last Modified: | 19 Apr 2016 02:07 |
URI: | http://repo.unand.ac.id/id/eprint/3028 |
Actions (login required)
View Item |