Analisis Kebijakan Pembentukan UPTD Laboratorium di Kab. Pesisir Selatan sebagai Upaya Pencegahan Kecelakaan Konstruksi

Yosritzal, Yosritzal and Titi, Kurniati and Eka, HP Analisis Kebijakan Pembentukan UPTD Laboratorium di Kab. Pesisir Selatan sebagai Upaya Pencegahan Kecelakaan Konstruksi. JTL UNAND. (Unpublished)

[img]
Preview
Text
Peer REviewDampak1 07-12-2020 at 22.56.25.pdf

Download (284kB) | Preview

Abstract

Pesisir Selatan Regency is a large regency at the south part of West Sumatera Province, Indonesia. Pesisir Selatan is prone to earthquake disaster because its location is above a fault lines. Therefore, a good quality and standardize building is a must in the region. However, Pesisir Selatan has no certified laboratory to test material for construction job as part of the quality assurance. Furthermore, the limited access to big cities such as Padang, made it difficult to bring and test the material to Padang. As the access is limited, testing for construction material and samples was conducted in a non-certified laboratory provided by local government. The result of the laboratory test could not be accounted for because the laboratory has not been certified. Anticipating the potential disaster in the future, the local government decided to develop a proper laboratory unit called Unit Pelaksana Tugas Daerah Laboratorium (Laboratory Regency Task Force Unit). The main task of the unit is to develop a standardize laboratory and make a preparation for administering the laboratory certification. However, the development of the unit should be carefully studied because it will need a significant cost for development and maintain the equipment. This paper presents the feasibility study for the development of the unit based on their current condition and the prospective of income in the future. First, an audit of existing equipment, staffs, and building was conducted and then prospective of income was estimated. The audit of existing laboratory equipment and staffs was based on secondary data from the existing laboratory. Prospective income was estimated from spatial plans and long-term development plan of the regency. Furthermore, in order to know the opinion of government and the user of the laboratory, a questionnaire was distributed. Data shows that the development of the unit is feasible but some improvements should be conducted.

Item Type: Other
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Yosritzal yosritzal
Date Deposited: 30 Dec 2020 01:30
Last Modified: 30 Dec 2020 01:30
URI: http://repo.unand.ac.id/id/eprint/36948

Actions (login required)

View Item View Item